Prefabrication and installation of 7.200 tons of steel structure and 1.500 tons of piping.
|
Blasting and painting of fabricated steel parts and piping in Gemak Group's own in-house blasting and painting facility. |
Conversion of No.1 cargo hold and topside ballast tanks to FO storage tanks. |
Storage, transfer and installation of 21 gensets, their exh. gas boilers and 2 steam turbine generators as main machinery. |
Storage, transfer and installation of 888 auxiliary machinery and equipments. |
Modification of hull and ballast tanks for creation of sea chests of newly installed gensets. |
Modification of inner botoom structure to provide reinforcement for newly installed machinery. |
Installation of switchyard and hybrid platform above main deck for electricity distribution. |
Installation of exhaust tower above main deck for boilers and exhaust piping system including fabrication and installation of 21 denox units for emission control. |
Complete blasting and painting of holds and hull. |