Sea Installer; WINDFARM INSTALLATION VESSEL

 

Sea Installer; WINDFARM INSTALLATION VESSEL 

Sea Installer – Self Elevating and Self Propelled Installation Vessel Upgrade Project is being executed by Gemak Group with the following main composition

  • Replacement of main crane from 900t @ 24m to 1600t @ 32m
  • Addition of 3.5m wide sponson structures on each side of the vessel
  • Increase of pre-load capacity from 9000t to 9800t
  • Increase of leg length from 82.5m to 92.5m and upgrade of jacking system
  • Increase of complement from 60 to 80 POB

 