Sea Installer; WINDFARM INSTALLATION VESSEL
Sea Installer – Self Elevating and Self Propelled Installation Vessel Upgrade Project is being executed by Gemak Group with the following main composition
- Replacement of main crane from 900t @ 24m to 1600t @ 32m
- Addition of 3.5m wide sponson structures on each side of the vessel
- Increase of pre-load capacity from 9000t to 9800t
- Increase of leg length from 82.5m to 92.5m and upgrade of jacking system
- Increase of complement from 60 to 80 POB