1) DNV Close Up Inspection and Hull Inspection Works: Two NDT companies, one of with rope access certificate. All inspections according to DNV IIP, approx 2000 pages of reports: 7 NDT methods applied include 1 new method ACFM: ACFM (Alternating Current Field Measurement) UTM (Ultrasonic Thickness Measurement), MPI (Magnetic Particle Inspection), PT (Dye Penetrant Test), RT (Radiographic Test), UT (Ultrasonic Test), VT ( Visual Test ) 2) Steel renewals all around the platform 3) Chain Inspection and Recertification Works: 5 of the 8 chains have been inspected, necessary changes done, recertified by DNV 4) Transportation Works: - Transporting new parts of BOP and Drilling Equipments: SWL 80 ton DEMAG CC 2800 Crane with Fly Boom
- Transporting new parts of Drilling Equipments to top of tower: Liebherr LTM 8.1 Crane built with fly boom for 110 meters height operations
5) New Accomodation Works: 8 pieces containers for accomodation within 1 piece of HVAC have been fitted, includes new structural additions 6) Refurbishment Works in following locations; Existing Accomodation Galley and Messroom Dry Food Store, Cold Rooms Laundry New Coffee Shop 7) Underwater Inspection Works : CCTV underwater inspection, valves blinding, sea chest cleaning, eliminating leakages on shafts 8) Passive Anodes Renewal Works: 640 pieces of underwater and overwater anodes replaced 9) Anchor Winches Overhauling Works: 8 pieces anchor winches overhauled include replacements 10) Piping Works All Around The Rig: Total 5362 meter of pipe renewed / new lines added 11) Valve Works All Around The Rig: Total 342 pieces valve renewed and 43 pieces valves overhauled 12) Tank Coating Works: Full blasting and painting of the potable and fresh water tanks 13) Cabling Works: Over 3000m meters of cabling carried out 14) All works completed 90 days, documented with 69 files: As Built Dossier Documentation: Project Quality Plan, Project Quality Control Plan, QCPs (Work Based Prepared ITPs), Inspection Certificates, Material&Consumables Certificates, Production Engineering Drawings by GEMAK, Welding Book with Welding Logs, NDT Logs, Reports, Sketches, Paint Progress Reports, Equipment Calibration Certificates, Inspection Request Form and Inspection Progress Log |