| In order to reduce air draft of the vessel, wheelhouse was cut-off after removal of all equipment inside and outside from a certain level. The whole work scope was consisting of following items. 
| Design work for lifting arrangement. | 
| Marking of equipment and cutting line | 
| Condition control of equipment |
|